Close Menu
  • Home
  • UNSUBSCRIBE
  • News
  • Lifestyle
  • Tech
  • Entertainment
  • Sports
  • Travel
Facebook X (Twitter) WhatsApp
Trending
  • 800-year-old ‘hugging skeletons’ are genetically confirmed as Poland’s only medieval same-sex double burial
  • There’s a new T. rex from the dinosaur age — and it ruled the seas with a skull-crushing bite
  • Great Pyramid of Giza is remarkably resilient to earthquakes —‬ and it’s due to the ancient Egyptians’ ‘extraordinary’ engineering knowledge
  • China’s real-life ‘transformer’ mech is a giant humanoid robot that can switch from bounding on 4 legs to walking on 2
  • How can we prevent AI models from cannibalizing themselves when human-generated data runs out? Scientists say they’ve found the answer.
  • ‘The system is likely to reach a breaking point’: Major Italian volcano is speeding toward a transition, and a major eruption could be on the way
  • China installs world’s largest floating wind turbine in deep water test — it generates enough energy to power 4,200 homes annually
  • Diagnostic dilemma: A biopsy of a woman’s cancerous tumor caused it to vanish
Facebook X (Twitter) WhatsApp
Baynard Media
  • Home
  • UNSUBSCRIBE
  • News
  • Lifestyle
  • Tech
  • Entertainment
  • Sports
  • Travel
Baynard Media
Home»Lifestyle»NASA delays historic Artemis missions — yet again
Lifestyle

NASA delays historic Artemis missions — yet again

EditorBy EditorDecember 6, 2024No Comments3 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Share
Facebook Twitter LinkedIn Pinterest Email

NASA has announced further delays to its Artemis program, which promises to return astronauts to the moon for the first time since 1972.

The Artemis 2 mission, originally slated to launch astronauts around the moon and back in September 2025, has been pushed back to April 2026. And the follow-up, Artemis 3, once targeted for late 2026, will be moved to mid 2027, NASA Administrator Bill Nelson said at a news conference on Thursday (Dec. 5).

This means that Artemis 2 will launch around 17 months after it was initially scheduled. NASA says the delay is due to the Orion capsule — which sits atop the 30-story Space Launch System (SLS) — needing additional prep time before it can safely carry a human crew.

“We and our industry and international partners need this time to make sure that our own capsule is ready to safely deliver our astronauts to deep space and back to Earth,” Nelson said. “We do not fly until we are confident that we have made the flight as safe as possible for the humans on board. We need to do this next test flight, and we need to do it right.”

The SLS is the largest NASA rocket since the Apollo program’s Saturn V rocket. It has a liquid hydrogen and oxygen core booster with two smaller rocket boosters attached to its sides.

Related: NASA announces Artemis astronauts who will fly to the moon for the 1st time in 50 years

For the Artemis 1 flight in November, 2022, the rocket sent the Orion capsule on a six-day, 69 mile-high (111 kilometers) flyby of the moon’s surface, enabling NASA engineers to gather vital data on the module’s trajectory and the effects of low gravity on three humanoid mannequins that were on board.

Get the world’s most fascinating discoveries delivered straight to your inbox.

Then, upon its dramatic return through Earth’s atmosphere at 32 times the speed of sound, the capsule’s heat shield was put to the test. The extreme air friction and its parachute slowed the spacecraft to just 20 mph (32.2 km/h), after which it plopped down off the coast of Baja California, Mexico, in the Pacific Ocean.

After examining the Orion capsule, NASA engineers discovered that the Lockheed Martin-manufactured spacecraft’s heat shield had been cracked and partially eroded as it bounced off the atmosphere during the capsule’s reentry.

“While the capsule was dipping in and out of the atmosphere as part of that planned skip entry, heat accumulated inside the heat shield outer layer, leading to gases forming and becoming trapped inside the heat shield,” Pam Melroy, NASA’s Deputy Administrator, said at the news conference. “This caused internal pressure to build up and led to cracking and uneven shedding of that outer layer.”

NASA won’t replace this heat shield for the Artemis 2 mission, but other technical issues with the craft — including its battery and life support systems — prompted the space agency to call for a six-month delay.

Despite these problems, Nelson insisted that the mission will launch in time to beat China in the race to send a crewed mission to the moon. China has recently landed rovers on the moon and Mars and completed construction of its Tiangong space station in 2022. The country is also leading construction efforts of an International Lunar Research Station, which is slated for completion by 2030.

“Assuming the SpaceX lander is ready, we plan to launch Artemis III in mid-2027,” Nelson said. “That will be well ahead of the Chinese government’s announced intention to land on the lunar surface by 2030.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleGoogle Pixel brings back popular camera features in new update
Next Article Former transgenders, parents demand end to ‘butchery’ of children through sex change surgeries
Editor
  • Website

Related Posts

Lifestyle

800-year-old ‘hugging skeletons’ are genetically confirmed as Poland’s only medieval same-sex double burial

May 21, 2026
Lifestyle

There’s a new T. rex from the dinosaur age — and it ruled the seas with a skull-crushing bite

May 21, 2026
Lifestyle

Great Pyramid of Giza is remarkably resilient to earthquakes —‬ and it’s due to the ancient Egyptians’ ‘extraordinary’ engineering knowledge

May 21, 2026
Add A Comment

Comments are closed.

Categories
  • Entertainment
  • Lifestyle
  • News
  • Sports
  • Tech
  • Travel
Recent Posts
  • 800-year-old ‘hugging skeletons’ are genetically confirmed as Poland’s only medieval same-sex double burial
  • There’s a new T. rex from the dinosaur age — and it ruled the seas with a skull-crushing bite
  • Great Pyramid of Giza is remarkably resilient to earthquakes —‬ and it’s due to the ancient Egyptians’ ‘extraordinary’ engineering knowledge
  • China’s real-life ‘transformer’ mech is a giant humanoid robot that can switch from bounding on 4 legs to walking on 2
  • How can we prevent AI models from cannibalizing themselves when human-generated data runs out? Scientists say they’ve found the answer.
calendar
May 2026
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Apr    
Recent Posts
  • 800-year-old ‘hugging skeletons’ are genetically confirmed as Poland’s only medieval same-sex double burial
  • There’s a new T. rex from the dinosaur age — and it ruled the seas with a skull-crushing bite
  • Great Pyramid of Giza is remarkably resilient to earthquakes —‬ and it’s due to the ancient Egyptians’ ‘extraordinary’ engineering knowledge
About

Welcome to Baynard Media, your trusted source for a diverse range of news and insights. We are committed to delivering timely, reliable, and thought-provoking content that keeps you informed
and inspired

Categories
  • Entertainment
  • Lifestyle
  • News
  • Sports
  • Tech
  • Travel
Facebook X (Twitter) Pinterest WhatsApp
  • Contact Us
  • About Us
  • Privacy Policy
  • Disclaimer
  • UNSUBSCRIBE
© 2026 copyrights reserved

Type above and press Enter to search. Press Esc to cancel.