Close Menu
  • Home
  • UNSUBSCRIBE
  • News
  • Lifestyle
  • Tech
  • Entertainment
  • Sports
  • Travel
Facebook X (Twitter) WhatsApp
Trending
  • Tracking Air Wisconsin’s sale to CSI Aviation, an ICE contractor
  • Average Height by Country: Updated in 2024
  • Trump targets drug imports with tariffs up to 100%
  • Orange County Supervisors Confront Themselves
  • In photos: Artemis II’s historic launch for the moon
  • Florida AG warns social media firms face billions in fines over kids ban
  • Arizona girl who went missing 32 years ago found alive
  • Best Places To Live in South America: Top 10
Facebook X (Twitter) WhatsApp
Baynard Media
  • Home
  • UNSUBSCRIBE
  • News
  • Lifestyle
  • Tech
  • Entertainment
  • Sports
  • Travel
Baynard Media
Home»Lifestyle»NASA’s Artemis II rocket rolls to launch pad in final bid to meet April deadline
Lifestyle

NASA’s Artemis II rocket rolls to launch pad in final bid to meet April deadline

EditorBy EditorMarch 20, 2026No Comments2 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Share
Facebook Twitter LinkedIn Pinterest Email

NASA’s Artemis II moon rocket is back on the move, as the space agency prepares the spacecraft for a potential launch before its April deadline.

This is the second time that the 322-foot-tall (98 meters) Space Launch System and Orion capsule stack has rolled out to the launchpad this year, the first having taken place on Jan. 17. But following two wet dress rehearsals and two leaks, NASA decided to wheel the rocket back to the Vehicle Assembly Building for repairs.

If the fixes have worked as planned, the rocket could blast off as early as April 1. It will take the mission’s four-person crew, who went into quarantine this week, on a 10-day flight around the moon and back.

Article continues below


You may like

Embarking from the Vehicle Assembly Building to Launch Pad 39B at NASA’s Kennedy Space Center in Florida, the 11 million-pound (5 million kilograms) stack is trundling along at a speed of about 1 mph (1.6 km/h along a 4-mile (6.4 kilometers) route.

The journey is set to take up to 12 hours, with the trip delayed for several hours due to high winds, according to NASA.

Once at the pad, the rocket will undergo a series of final tests, including a wet dress rehearsal to fill the rocket with hydrogen fuel and oxygen oxidizer. If all of these hurdles are cleared, NASA will announce a date within the April window, which includes April 1 to 6 and also April 30, for a launch attempt.

In 2024, the space agency set April 2026 as the furthest deadline for the launch of Artemis II, after which the mission will be considered delayed.

Get the world’s most fascinating discoveries delivered straight to your inbox.

This isn’t the first time an Artemis rocket has had issues. The SLS rocket for the Artemis I mission went back to the Vehicle Assembly Building more than once in 2022, before eventually taking off and completing its uncrewed test flight around the moon later that year.

These cumulative delays led NASA to announce a major overhaul of the Artemis program with the agency now aiming for annual launches, potentially dropping SpaceX and Boeing from its mission plans, and targeting two lunar landings in 2028.

NASA claims its return to the moon for the first time since the Apollo era will be a vital test of its systems before attempting a future crewed mission to Mars and beyond.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleInvestigators probe suspicious activity near Nancy Guthrie’s home
Next Article How Cooked is Fullerton’s Budget?
Editor
  • Website

Related Posts

Lifestyle

Average Height by Country: Updated in 2024

April 3, 2026
Lifestyle

In photos: Artemis II’s historic launch for the moon

April 3, 2026
Lifestyle

Best Places To Live in South America: Top 10

April 2, 2026
Add A Comment

Comments are closed.

Categories
  • Entertainment
  • Lifestyle
  • News
  • Sports
  • Tech
  • Travel
Recent Posts
  • Tracking Air Wisconsin’s sale to CSI Aviation, an ICE contractor
  • Average Height by Country: Updated in 2024
  • Trump targets drug imports with tariffs up to 100%
  • Orange County Supervisors Confront Themselves
  • In photos: Artemis II’s historic launch for the moon
calendar
April 2026
M T W T F S S
 12345
6789101112
13141516171819
20212223242526
27282930  
« Mar    
Recent Posts
  • Tracking Air Wisconsin’s sale to CSI Aviation, an ICE contractor
  • Average Height by Country: Updated in 2024
  • Trump targets drug imports with tariffs up to 100%
About

Welcome to Baynard Media, your trusted source for a diverse range of news and insights. We are committed to delivering timely, reliable, and thought-provoking content that keeps you informed
and inspired

Categories
  • Entertainment
  • Lifestyle
  • News
  • Sports
  • Tech
  • Travel
Facebook X (Twitter) Pinterest WhatsApp
  • Contact Us
  • About Us
  • Privacy Policy
  • Disclaimer
  • UNSUBSCRIBE
© 2026 copyrights reserved

Type above and press Enter to search. Press Esc to cancel.